Open house for the Utah Department of Transportation’s (UDOT) Phoston Spur & Rail Trail Study and U.S. Route 40 Corridor Study

You are invited to attend a combined open house for the Utah Department of Transportation’s (UDOT) Phoston Spur & Rail Trail Study and U.S. Route 40 Corridor Study between 5 and 7 p.m. on Tuesday, June 3, 2025. Come meet the study teams, learn about both studies’ goals and next steps, and provide feedback on current and future transportation needs in Summit and Wasatch Counties.

Please accept or decline (if you haven’t already) the invitation so we can prepare with the correct number of bicycles.  We will meet at the Summit Bike Share Station near the Summit County Health Department at 650 Round Valley Drive.  The route we will bicycle can be found here.

Summit Bike is kindly arranging for e-bikes for the group, Please bring your own helmet if desired, water, a hat, sunscreen, and comfortable shoes.

The public is welcome to attend and provide feedback any time during the open house. There will not be a formal presentation.

Phoston Spur & Rail Trail Study

UDOT is conducting the Phoston Spur & Rail Trail Study, which aims to improve nonmotorized transportation connections in Summit and Wasatch Counties. By understanding the regional trail network and connectivity needs of the area, the study team will develop a preferred concept that meets local and state needs.

U.S. Route 40 Corridor Study

UDOT is conducting the U.S. Route 40 Corridor Study, which will identify long-term, holistic solutions to move people safely and efficiently throughout the corridor as the area continues to grow.

Open House

Date: Tuesday, June 3, 2025
Time: 5–7 p.m.
Location: Utah Film Studios
Second-Floor Annex 4001 Kearns Blvd Park City, UT 84060